Kazakhstan SANY Parts Information GuideKazakhstan SANY Parts Information GuideIndependent parts information and quality document guidance
Batch Record Links

How Can I Tell Whether a Test Report Actually Relates to the Batch of Parts Being Delivered?

A test report only relates to delivered parts when the purchase line, delivery line, batch code and report sample identifier form a documented chain. Matching descriptions or dates alone do not prove that link.

How Can I Tell Whether a Test Report Actually Relates to the Batch of Parts Being Delivered?

Direct answer: You cannot tell from a part number, a similar description or a matching date alone. You need a recorded chain from the purchase order line to the delivery note line, then to the batch or lot code physically marked on the delivered items, then to the exact sample identifier named in the test report. For a multi-box delivery to a remote Kazakhstan project, check each delivery line separately. If any link is missing, treat the report as an identified sample result, not yet as evidence about the delivered batch.

1. Why a matching date or description is not enough

A test report can be genuine, applicable to the same part number, and even dated around the same production period, but still not belong to the specific units in your delivery.

The link must be based on identifiers that travel with the delivery, not on similar appearance or timing.

A batch or lot code may be called a lot number, heat number, casting date code, serial range, or production order code. Whatever it is called, the exact code must be visible on the part, its sealed packaging, or the delivery record.

2. Separate the five questions

When checking a report, keep these separate:

  • Part identity: what the part is and its applicable part number, suffix or revision.
  • Fitment: whether that part is correct for the machine serial number, build configuration or catalogue revision.
  • Provenance: where the part came from and whether the source is documented.
  • Sample result: what was tested on the identified sample.
  • Batch acceptance: whether the delivered batch is covered by the accepted inspection or test plan.

A report can support the sample result question without answering the batch acceptance question.

3. Build the traceability chain

Purchase line to delivery line

Ask the supplier to show that the delivery note line matches the purchase order line.

Check the part number, suffix, quantity, unit of measure, and any agreed revision or supersession note.

A delivery line that only says 'filter, as ordered' without a batch code is not a link.

For a multi-box delivery, do not treat the delivery as one block. A report may cover only one box, one production lot, or one item line.

Delivery line to physical marking

Check the physical items or their sealed packaging for a batch or lot code.

Photograph the label or marking with the part number and batch code in the same frame where possible.

If the part is already installed or the packaging removed, record the information from the nameplate or housing before it is lost.

Physical marking to report sample identifier

Find the sample identifier in the test report.

It must match the batch or lot code exactly, character for character, including leading zeros, hyphens, spaces or suffix codes.

A report that lists a batch code is useful. A report that lists no sample identifier cannot be connected to your delivered batch.

Report sample identifier to sampling scope

Ask what the sample represents.

For example, the report may name one batch, several batches, a production date range, or a single container.

Ask how the sample was selected and recorded. Do not invent sample sizes or acceptance thresholds.

Only the responsible parties, using the purchase order requirements, applicable manufacturer documents or the agreed acceptance plan, can decide what sampling scope is acceptable.

4. Assess missing and conflicting links

A missing link is not proof of fraud. It means the evidence chain is incomplete.

A conflict is also not proof of fraud. For example, the delivery label may show batch B-2407 while the report shows sample B-2407-01. That may be a legitimate sub-batch or packaging code, but it is not the same identifier until the supplier explains it.

Handle missing or conflicting links as open queries:

  • Missing: request the document that connects the delivery line to the batch code.
  • Conflict: request a written explanation or a corrected delivery list.
  • Date-only match: request the sample identifier, not only the date.

5. What is needed before receipt review can proceed

For each delivery line being checked, the following evidence is normally needed:

  1. Purchase order line and delivery note line with matching part number, suffix and quantity.
  2. Physical batch or lot code on the delivered part or sealed packaging.
  3. Test report sample identifier exactly matching that batch or lot code.
  4. A written statement or record of what the sample represents.
  5. The agreed acceptance criteria from the purchase order, contract, applicable manual or approved inspection plan.

If these are not present, the receipt can be recorded as conditional or quarantined, depending on the project's receiving procedure.

Do not use the test report as batch evidence until the identifier link is complete.

6. Procurement next step

Send a short supplier query listing each delivery line and the exact missing evidence.

Ask for a packing list or traceability matrix that maps each purchase line to a delivery line, batch code and report identifier.

If the supplier cannot provide that mapping, ask them to confirm in writing what the report sample represents and whether it includes your delivered batch.

Record the answer and keep it with the delivery documents.

Parts Matching Support

If you are preparing a supplier query, a parts matching platform such as MechLink may help you organize model, serial number, old part number, component or housing photos, and relevant labels or records into one request. MechLink is an external commercial service; it does not authenticate test reports or certify batches. Kazakhstan Phone / WhatsApp: +77026412810.

7. Sources

  • No external manufacturer test report, parts catalogue, standard or supplier record was inspected for this article.
  • The checks above are general supply-chain traceability reasoning and do not replace the applicable purchase order, delivery records, manufacturer documents or agreed acceptance plan.

Related Resources and Supply Support